Client
PS Structures
Scope of Works
The Viridian Glass Processing and Distribution Centre is a purpose built factory constructed for CSR Viridian on behalf of Jandakot Airport Holdings at the Jandakot Airport Industrial Precinct.
The facility consists of a 12600m2 factory, 700m2 office, 600m2 maintenance workshop and over 10,000m2 of hard standing and carparking.
DCSWA were involved in the electrical design and construction of the project which was completed on time within 12 months.