The construction of the Oceaneering Facility consisted of building 4 new buildings. The facility was constructed at the Jandakot precinct and was undertaken as a Design and Construct contract.

The electrical services work comprised:

  • Liaison with Western Power and Telstra to provide headworks and incoming services
  • LV switchboards
  • Power factor correction
  • Utility power consumption metering
  • LV mains and submains cabling
  • Cable trays and other cable support systems
  • Earthing systems
  • General power distribution
  • Power to mechanical services switchboards
  • Power to hydraulic equipment
  • Power to lifts
  • Private power consumption metering system
  • Provision of conduit access to enable installation of services by others
  • Lighting
  • Intelligent lighting control system
  • Emergency lighting
  • Voice & Data communications infrastructure
  • Master antennae television system (MATV)
  • CCTV system
  • Access control system
  • Intruder detection system
  • Fire Detection System
  • Occupant Warning System
  • Commissioning